Skip to content
Menu

What you need

Overhaul & Relocation

Proof

Company

Bahasa Indonesia

FORMAT CHANGE

Format change, accepted at production speed

We assess it from photos and machine data. A package offer: scope in, scope out, working days and acceptance test.

Fixed scope and date

All on one written page, agreed before work starts. The acceptance test runs at production speed and is signed at the end.

Send the old and new format
Ilustrasi

When you need this

  • An order or contract needs a new pack or rod format, with a production start date already set.
  • The machine has been changed over before, but results were unstable or needed days of re-adjustment.
  • Your own team has not done this changeover and does not want to experiment on the production schedule.
  • You need a firm number of days and cost for a budget approval.

What is included

  • Both lists, in and out, are written per job on the scope page and agreed before work starts.
  • An acceptance test on the machine at production speed, signed at the end of the job.

What is not included

  • Anything outside the written scope: discussed and approved in writing before it is done.

T-04 · FORMAT-CHANGE SCOPER

Scope your format change

Tell us the current and new format. You get one page with what is in, what is out, how many days and the acceptance test, agreed before we travel.

03 Which machine?
SCOPE PAGE · DRAFT

— —

— · — · —

Scope in
Written in the scope page
Scope out
Written in the scope page
Working days
Written in the scope page
Acceptance test
Written, at production speed, signed at the end

What usually changes on this machine

New stick diameter or length: garniture, tongue piece and knives reset, then a test run at production speed.

New filter rod diameter or length: format parts and settings changed, closed with a test run.

New pack size or style: format parts, folding settings, and an acceptance test at production speed.

YOUR MESSAGE

Hello Aldikarya, I am planning a format change.
Current format: 
New format: 
Machine: 
Model: 
Target date: 
Country: 
I found you via: 

You approve the scope page before work starts.

Proof

180 packs/min

G.D GDX-1 returned to full production

A G.D GDX-1 packer rebuilt from a frame in about 20% condition to 180 packs a minute, 10 months faster than the OEM route.

Read the case study

How it runs

  1. 01Send the old and new formatMachine type, current format, target format and the production date you are aiming for.
  2. 02We send one pageScope in and out, working days and the acceptance test, from an assessment of your photos and machine data.
  3. 03You approve, we do the workWork starts once the page is approved, on the dates written in it.
  4. 04Acceptance testThe machine runs the new format at production speed and the signed page closes the job.

Frequently asked questions

Which machines can you change over?

The makers and packers we work on: Hauni/Körber Protos, G.D GDX/GDX-1, Molins HLP and Focke M350.

How many days does it take?

The number of days is written on the scope page for your machine and agreed before work starts.

What happens if we find a problem outside the scope?

We stop, report what we found, and wait for your written approval before doing it.

How do we know the job is finished?

By the acceptance test: the machine runs the new format at production speed, and the page is signed at the end of the job.

Where does payment go?

Payment goes only to an account in the company's name.

Licensed manufacturers only.