TRAINING
Operator and mechanic training, on your own line
A short class at your plant, then practice on the machines your people run daily. Each person is assessed at the machine; management gets the report.
Proposal in 48 hours
Name the machine and the number of participants. A fixed-price proposal follows within 48 hours.
When you need this
- Only two or three people can handle a given machine, and the line depends on them.
- New operators take a long time to release, and nobody can say exactly when they will be ready.
- A new line, a relocated machine or an overhauled machine will be run by a team that does not know it yet.
- You want fewer stoppages caused by operating mistakes.
What is included
- A class in your training room, then on-the-job practice on your line.
- Each participant assessed while working at the machine, not only by a written test.
- A report for management: who can be released, and who still needs support.
- Material built for each machine and fitted to your plant's work standards.
What is not included
- Open classes or individual places: our programmes are for factories and run on that factory's machines.
- Third-party certification.
- One client's internal material is never reused for another client.
T-03 · TRAINING FIT CHECK
Which training fits your team?
Three questions. We suggest the programme and you send the answers in one message.
Proof
3 days
until the second batch was ordered
One of our cigarette-factory clients had its operators trained on a high-speed maker over about 3 months. Three days after the first batch finished class, the client ordered a second batch with twice as many participants.
Read the case studyHow it runs
- 01Tell us the machine and the peopleMachine type, number of participants, operators or mechanics, and their starting level in rough terms.
- 02Proposal in 48 hoursA fixed group price, the class schedule and how results are assessed.
- 03Class, then practice at the machineA short class at your plant, then a trainer next to your people on the production line.
- 04Report for managementThe assessment for each participant, and who is ready to be released.
Frequently asked questions
How long does the programme take?
It depends on the machine, the number of participants and their starting level. As a reference, one client programme ran about 3 months: 2 weeks of class (10 days, 7 hours a day), then practice on the production line.
Do you train at our factory?
Yes. The class can be in your training room, and practice is on your own production line.
How do we know an operator is ready?
Each participant is assessed while working at the machine. Our report states who can be released and who still needs support.
Who is the trainer?
Our engineering team, with 20 years on the secondary line of a multinational cigarette manufacturer, plus 5+ years as technical trainers.
Can you train outside Indonesia?
Training abroad is not offered yet. We are testing a training platform that can support remote assessment; see the pilot page.
